Transpower Blenheim Stoke
Condition Surveys - Cathodic Protection
Condition Surveys - FRP
Hastings WWTP
Mt Albert Sewer Interceptor
Mt Cargill
Old Queenstown Courthouse
Rangitata Arundel Bridge
Paturau Bridge
55 Upper Queen Street
Clandeboye Boiler Stack
Trimble Rebuild
Crowne Plaza, Queenstown
Northridge Apartments
Sugarloaf Communications Tower

  Search References
Search the project reference archive.
Search
Or select one of the drop down topics to view all the related references.
Smart Search
Winstone Wallboards Warehouse

The post-tensioned slab for the new warehouse was poured in two stages with the central joint in compression and joined with coupled tendons which required that the first slab be fully stressed prior to pouring the second slab.

Nov - Dec 2007

Key Words: post tensioned, slab, design, stressed,
post-tensioned slabs


Winstone Wallboard1.pdf