Project References PDF Files
Page: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | 15 | 16 | 17 | 18 | 19 | 20 | 21 | 22 | 23 | 24 | 25
Transpower ISL - KIK
Transpower Blenheim Stoke
Condition Surveys - Cathodic Protection
Condition Surveys - FRP
388 Great North Road
Mt Albert Sewer Interceptor
Kerikeri Heritage Bypass
Old Queenstown Courthouse
Rangitata Arundel Bridge
Pegasus Water Treatment
Winstone Wallboards Warehouse
Bunning Home Store & Retail Centre
Lancaster House
Huia Aqueducts
Clyde Reservoir

  Search References
Search the project reference archive.
Search
Or select one of the drop down topics to view all the related references.
Smart Search
Winstone Wallboards Warehouse

The post-tensioned slab for the new warehouse was poured in two stages with the central joint in compression and joined with coupled tendons which required that the first slab be fully stressed prior to pouring the second slab.

Nov - Dec 2007

Key Words: post tensioned, slab, design, stressed,
post-tensioned slabs


Winstone Wallboard1.pdf