Winstone Wallboards Warehouse

The post-tensioned slab for the new warehouse was poured in two stages with the central joint in compression and joined with coupled tendons which required that the first slab be fully stressed prior to pouring the second slab.

Nov - Dec 2007

Key Words: post tensioned, slab, design, stressed,
post-tensioned slabs